Power / Current Calculator
Energy Consumption
Voltage Drop Estimate
Preliminary copper-conductor estimate only. Final conductor size must be verified against applicable code, ampacity, installation method, temperature, grouping, voltage drop limits, and actual equipment requirements.
Ohm's Law
Technician Quick Notes
| Date | Equipment | Model | Symptom | Notes |
|---|
Electrical Load & Feeder Planning
Planning assistant for preliminary load schedules and feeder documentation. Final breaker, conductor, grounding, fault-current and protection selection must be verified by a qualified electrical professional using actual equipment data and applicable code.
Distribution Panel / Breaker Schedule Designer
Create a professional circuit schedule and simple one-line concept for quotations, site surveys and handover documents.
| # | Circuit / Load | Area | W | Calculated A | Pole | Proposed Breaker | Proposed Wire | Notes |
|---|
“Proposed Breaker” and “Proposed Wire” are editable documentation fields for the technician/engineer to fill after verification.
+ PROTECTION
Electronics Diagnostic Workbench
Useful for TV, aircon control boards, washing machines, power supplies, appliances and general electronics repair. It organizes diagnosis; it does not replace manufacturer service information.
Resistor Helper
LED Series Resistor
Capacitor Energy
Power Supply Check
Symptom → Diagnostic Checklist
Repair Job & Parts Record
Connected workflow: Saving a repair record also queues it for Customer CRM, Job Order, Receivables, Project Profit, Warranty/Service, and Materials Inventory. Open those modules to complete the sync on this device.
| Date | Customer/Job | Equipment | Complaint | Diagnosis | Parts | Total | Warranty |
|---|
Safety Reminder
This toolkit provides preliminary calculations and record-keeping support. Isolate equipment, verify absence of voltage, use correct PPE and instruments, and follow manufacturer instructions and applicable electrical rules. Do not bypass protective devices or perform hazardous live testing.