ADWORKS

Professional Solar & Engineering Solutions

Company Profile & Document Signatory

Clean PDF: Export / Save PDF uses a zero-margin print layout to suppress browser path/time stamps on supported browsers. If Chrome still shows them, open More settings and turn off “Headers and footers.”

Saved locally on this device. The prepared-by name, title, signature and date appear on the client proposal. Internal costing/markup stays out of the customer PDF.

PROPOSAL

A Smarter Energy Upgrade for Your Home or Business

Designed around your actual energy needs — with practical backup, scalable solar capacity, and a clear investment proposal you can review with confidence.

Lower grid dependenceBackup-ready designExpandable systemProfessional installation

Prepared Especially For

Recommended Energy Solution

Estimated Client Savings & ROI

A clear financial snapshot to help the client understand the practical value of the proposed solar investment.

Estimated monthly savings₱0
Estimated yearly savings₱0
Simple payback
10-year projected savings₱0
Enter the current monthly bill and project investment to generate an estimate.

Preliminary System Design & Single-Line Diagram

A clear visual overview of how the proposed solar, battery, grid, protection, and essential-load sections work together.

Adaptive Solar System - Preliminary Single-Line Diagram
AUTO TOPOLOGY
Uploaded project wiring or system design diagram
AC / power pathPV / battery DC pathGrounding / bonding concept
Preliminary proposal diagram only. Final conductor sizes, string configuration, breaker/fuse ratings, SPD selection, earthing/bonding, equipment terminals, protection coordination, utility interface, and installation method must be verified from actual equipment datasheets, site conditions, applicable electrical code, and qualified engineering review before construction.

Premium Proposal Template Studio

Choose a client-facing proposal style and apply your own company branding. Proposal content, calculations, ROI, BOM and engineering data remain the same.

Company Profile & Client Trust Section

Set this once for your company. The information below is reusable in professional client proposals and remains editable.

Preliminary Bill of Materials

Automatically prepared from the accepted system recommendation. Quantities are editable planning allowances and must be verified against the actual site, equipment datasheets, final string layout, mounting method, cable routes, protection coordination, and applicable electrical code before procurement.

Item / Material GroupPreliminary QtyUnitNotes
Engineering note: This BOM intentionally does not auto-select final conductor size, breaker/fuse ampere rating, SPD rating, grounding conductor size, or exact PV string configuration. Those items depend on verified equipment electrical data and actual installation conditions.

Why This Recommendation Makes Sense

Right-sized for the clientSystem capacity is based on the assessed load and selected backup requirement, subject to final site verification.
Energy securityHybrid architecture can support selected essential loads during outages, subject to actual load and battery state.
Built for future needsThe proposal can be refined for future load growth, additional panels, or battery expansion where compatible.

Investment Proposal

DescriptionQtyUnit PriceAmount
TOTAL PROJECT INVESTMENT
₱0
Final scope and equipment are subject to site validation and customer approval.

What the Client Receives

Project Terms & Protection

Prepared By

Authorized Representative
Date Prepared:
Digital signature
ADWORKS

Customer Acceptance

I have reviewed this proposal and agree to proceed subject to the stated scope, terms, final site validation, and applicable engineering confirmation.

Signature over printed name
Date
Professional-use notice: This proposal is a commercial planning document generated from editable project inputs. Final engineering design, protection, permits, equipment compatibility, structural conditions, prices, and utility requirements must be verified by qualified professionals and applicable authorities before installation.